Retention & Structure Package
Burwood, Victoria
December 2024 - April 2025
Retention & Structure Package
S&W Construction
Multi-Unit Residential Development
920m²
Slab Prepped & Poured
300m²
Shotcrete Wall Sprayed
Di Martino Earthworks delivered the full retention and structure package for this 4-unit residential development in Burwood for S&W Construction — managing every aspect of the works from first cut to final slab pour, and completing the package well ahead of schedule.
Retention scope included site cut, piling, capping beam installation, basement bulk excavation, shotcrete wall preparation and spray, plus foundation excavation and placement. All materials and installation were managed in-house, including steel supply and fixing, concrete supply and placement, and waterproofing. The structure package then followed, comprising ground slabs, walls, stair cores and suspended slab preparation and pour, sequenced and coordinated entirely by the Di Martino Earthworks team.
110m
Capping Beam Prepped & Sprayed
65+
Piles Drilled at 450mm diameter