worrall st, burwood

Retention & Structure Package

location

Burwood, Victoria

timeframe

December 2024 - April 2025

scope

Retention & Structure Package

client

S&W Construction

type

Multi-Unit Residential Development

project highlights

920m²

Slab Prepped & Poured

300m²

Shotcrete Wall Sprayed

Di Martino Earthworks delivered the full retention and structure package for this 4-unit residential development in Burwood for S&W Construction — managing every aspect of the works from first cut to final slab pour, and completing the package well ahead of schedule.

Retention scope included site cut, piling, capping beam installation, basement bulk excavation, shotcrete wall preparation and spray, plus foundation excavation and placement. All materials and installation were managed in-house, including steel supply and fixing, concrete supply and placement, and waterproofing. The structure package then followed, comprising ground slabs, walls, stair cores and suspended slab preparation and pour, sequenced and coordinated entirely by the Di Martino Earthworks team.

110m

Capping Beam Prepped & Sprayed

65+

Piles Drilled at 450mm diameter